High-level drilling involving geotechnical, direct push, and MiPHT methods. Project included multiple mobilizations over a 5 week duration.
Dozens of monitoring wells were installed on-site after the completion of 1,100 borings.
Installed SVE system designed by Langan inside of an active Ollie's Discount Store in Cherry Hill, NJ. All work was completed at night while the store was closed.
Performed injections for Advanced GeoServices at the Barclay Shopping Center in Cherry Hill, NJ. Injections contained organic compounds to treat contaminated groundwater in the localized area.
Installed six wells in Pennsylvania utilizing air rotary to 70' bgs. Rock was encountered at 10' bgs and continued to 55'.